Definition of the requirements on the energy system
In the "Specifications" area, you can select the requirements and preconditions of the planned PV system monitoring. You can select several requirements.
Requirement | Explanation |
---|---|
Optimizing self-consumption | You wish to obtain action recommendations for manual switching of loads in order to make optimal use of own PV energy on site (self-consumption). |
Analysis of consumption and management of loads | You wish to obtain an analysis of your consumption. You also wish to have automatic intelligent switching of loads in order to make optimal use of own PV energy on site. |
System monitoring via the internet and visualization of PV system data | You wish to monitor the PV system via the Internet and visualize the PV system data in the Internet. |
Online archiving | You wish to archive the PV system data in the Internet. |
Remote diagnosis | You wish to analyze PV system faults via the Internet. |
Visualization of PV system data on site | You wish to view the PV system data on site. |
PV system maintenance and parameterization on site | You wish to enable maintenance and parameterization of the PV system on site. |
Storage of PV system data on site | You wish to store the PV system data on site. |
Connecting external sensors | You wish to connect sensors from third-party manufacturers to the PV system (e.g. anemometer, ambient temperature sensor). |
Measuring global irradiation | You wish to measure the global irradiation. |
Reading out energy meters | You wish to read out the data of the feed-in meter, the PV production meter and the purchased electricity meter. |
Feed-in management | You wish to or need to participate in feed-in management with your PV system. In accordance with the Renewable Energy Sources Act (EEG) 2012, PV system operators with installed power of 30 kW to 100 kW must participate in feed-in management (variable active power limitation). PV system operators with installed power less than 30 kW have a choice: they can participate in feed-in management or they can limit the active power of their PV system to 70% (fixed active power limitation). |
Control of large-scale PV power plants | You wish to control and regulate your large-scale PV power plant (connection to a SCADA system). |
Wireless data transmission | You would like to wirelessly call-up the PV system data. |
Notification in case of disturbances | You wish to be notified if disturbances occur in the PV system. |