Procedure when designing a PV system with self-consumption


Procedure

See

1.

Starting Sunny Design

Starting Sunny Design

2.

Creating a new project or opening an existing project

Creating a new projectOpening an Existing Project

3.

Entering project data

Entering project data

4.

Configuring entire system (in quick planning)

With quick planning: configuring a system

5.

Defining a load profile (in detailed planning)

Entering load profile details

6.

Configuring PV system (in detailed planning)

Project page "Configure PV system"

7.

Cable sizing (optional, only in detailed planning)

"Cable sizing" project page

8.

Determining self-consumption (optional, only in detailed planning).

"Determine self-consumption" project page

9.

Planning energy management (optional)

"Planning the energy management" project page

10.

Analyzing efficiency (optional)

"Analyze Profitability" project page

11.

Overview of the results

"Results" project page

12.

Creating project documentation.

Issuing project documentation