Procedure when designing a large-scale energy system


Procedure

See

1.

Starting Sunny Design

Starting Sunny Design

2.

Creating a new project or opening an existing project

Creating a new projectOpening an Existing Project

3.

Entering project data

Entering project data

4.

Configuring the PV system

Project page "Configure PV system"

5.

Sizing cables (optional)

"Cable sizing" project page

6.

Planning energy management (optional)

"Planning the energy management" project page

7.

Analyzing efficiency (optional)

"Analyze Profitability" project page

8.

Overview of the results

"Results" project page

9.

Creating project documentation.

Issuing project documentation