Procedure when designing an off-grid system
Procedure | See | |
---|---|---|
1. | Starting Sunny Design | Starting Sunny Design |
2. | Creating a new project or opening an existing project | Creating a new projectOpening an Existing Project |
3. | Entering project data | Entering project data |
4. | Defining a load profile | Entering load profile details |
5. | Configuring the PV system | Project page "Configure PV system" |
6. | Configuring a battery system (optional) | Configuring the battery system |
7. | Configuring a genset (optional) | With off-grid systems: Configuring a genset |
8. | Sizing cables (optional) | "Cable sizing" project page |
9. | Viewing analysis of the energy and power in the system (optional) | For off-grid system: "Analyses of the energy and power in the system" project page |
10. | Overview of the results | "Results" project page |
11. | Creating project documentation. | Issuing project documentation |