Procedure when designing an off-grid system


Procedure

See

1.

Starting Sunny Design

Starting Sunny Design

2.

Creating a new project or opening an existing project

Creating a new projectOpening an Existing Project

3.

Entering project data

Entering project data

4.

Defining a load profile

Entering load profile details

5.

Configuring the PV system

Project page "Configure PV system"

6.

Configuring a battery system (optional)

Configuring the battery system

7.

Configuring a genset (optional)

With off-grid systems: Configuring a genset

8.

Sizing cables (optional)

"Cable sizing" project page

9.

Viewing analysis of the energy and power in the system (optional)

For off-grid system: "Analyses of the energy and power in the system" project page

10.

Overview of the results

"Results" project page

11.

Creating project documentation.

Issuing project documentation