Procedure when designing a PV system with total power feed-in to grid
Procedure | See | |
---|---|---|
1. | Starting Sunny Design | Starting Sunny Design |
2. | Creating a new project or opening an existing project | Creating a new projectOpening an Existing Project |
3. | Entering project data | Entering project data |
4. | Configuring entire system (in quick planning) | With quick planning: configuring a system |
5. | Configuring PV system (in detailed planning) | Project page "Configure PV system" |
6. | Cable sizing (optional, only in detailed planning) | "Cable sizing" project page |
7. | Planning energy management (optional) | "Planning the energy management" project page |
8. | Analyzing efficiency (optional) | "Analyze Profitability" project page |
9. | Overview of the results | "Results" project page |
10. | Creating project documentation. | Issuing project documentation |