Configuring systems with medium voltage
- Add a new project or open an existing project.
- The Enter project data page will open.
- In the area Voltage level, select the option Medium voltage.
- Depending on which inverters you wish to use in the PV system, select either Decentralized inverters or Central inverters under System type.
- Enter a specification for the Preferred minimum nominal power ratio.
- Enter the desired Medium voltage.
- If you have selected the Decentralized inverters option, select the required output voltage of the inverters from the Inverter grid connection drop-down list.
- If required, enable the checkbox Carry out optimized reactive power adjustment with Integrated Plant Control.