Adding charging stations
There are 3 ways to add a new charging station:
In menu My Sunny Design > Own charging stations
For projects with self-consumption: in the project on the page Define load profile
For energy-system projects: in the project on the page Energy system under Charging stations
Prerequisites:
For projects with self-consumption:
You must have opened a project and planned it up to the project page Define load profile.
E-mobility will also be planned in the project. In the E-mobility area, the option Take e-mobility into account is enabled.
For energy system projects:
You must have opened a project and planned it up to the project page Energy system.
E-mobility will also be planned in the project. On the project page Define scenario, the Charging stations option has been enabled in the System components area.
Procedure:
- In the menu My Sunny Design > Own charging stations: select [Add new charging stations].
or
In a project with self-consumption: On the page Define load profile in the area E-mobility, click on the button [New charging station].
or
In an energy system project: on the page Energy system in the graphic, select the button Charging stations. - The Charging stations window will open.
- Enter the type of the charging station.
- Adjust the number of charging points of the charging station in the field Number of charging points.
- Enter the Maximum charging power AC of the charging station.
- Enter the Maximum charging power DC of the charging station.
- Click on [OK] To add the new charging station.