Mounting Procedure
This section describes the procedure for mounting the components of an SMA Commercial Storage Solution.
It provides an overview of the steps, which must be performed in the prescribed sequence.
Procedure | See | |
---|---|---|
Prepare for mounting and connection of the inverter | ||
Mounting the Inverter | ||
Install the battery cabinet | ||
Mount the battery management system | ||
Mount the battery modules | ||
Mount the supplied temperature and humidity sensor | See the supplied manual for the temperature and humidity sensor | |
Mount the supplied energy meter | See manual for the energy meter | |
If a DC distributor is present, mount the DC distributor |
Also see: