Mounting Procedure


This section describes the procedure for mounting the components of an SMA Commercial Storage Solution.

It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Prepare for mounting and connection of the inverter

( > Preparing for mounting and connection)

Mounting the Inverter

( > Mounting the Inverter)

Install the battery cabinet

( > Positioning the battery cabinet)

Mount the battery management system

( > Installing the battery management system)

Mount the battery modules

( > Installing the battery modules)

Mount the supplied temperature and humidity sensor

See the supplied manual for the temperature and humidity sensor

Mount the supplied energy meter

See manual for the energy meter

If a DC distributor is present, mount the DC distributor

( > Mounting the DC Distributor)

    Also see: