Additionally Required Materials and Equipment
| Material or equipment | Quantity | Explanation | 
|---|---|---|
| Screws suitable for the inverter mounting base | 4 | For attaching the wall mounting bracket to the inverter mounting base | 
| Washers suitable for the inverter mounting base | 4 | For attaching the wall mounting bracket to the inverter mounting base | 
| Screw anchors suitable for the inverter mounting base | 4 | For attaching the wall mounting bracket to the inverter mounting base | 
| Screws suitable for the battery cabinet mounting base | 2 | For attaching the fixing brackets to the battery cabinet mounting base | 
| Screw anchors suitable for the battery cabinet mounting base | 2 | For attaching the fixing brackets to the battery cabinet mounting base | 
| Screws suitable for the temperature and humidity sensor mounting base | 2 | For attaching the temperature and humidity sensor (max. shaft 3 mm, head width 5 mm to 8 mm) | 
| Screw anchors suitable for the temperature and humidity sensor mounting base | 2 | For attaching the temperature and humidity sensor (max. shaft 3 mm, head width 5 mm to 8 mm) | 
| Field-assembly RJ45 connector with metal enclosure | 1-2 | Only required if the network cables for the inverter are not equipped with RJ45 connectors | 
| Means of transport (e.g., pallet truck or hand truck) | 1 | Used to transport packed components to the installation site | 
| Eye bolt (M10) | 2 | Only required if the inverter is to be transported with a hoist | 
| Lifting gear | 1 | Only required if the inverter is to be transported with a hoist | 
| Utility knife | 1 | Used to unpack the product | 
| Torx screwdriver (TX25) | 1 | Used to attach and remove carrying handles on the inverter and to mount the battery | 
| Torx screwdriver (TX30) | 1 | Used to mount the battery | 
| Torx screwdriver (TX40) | 1 | Used to attach the mounting brackets, to attach the product to the mounting brackets, to attach the connection plate to the product, to connect additional grounding | 
| Cross-head screwdriver (PH2) | 1 | Used to attach the battery modules and the battery management system in the battery cabinet | 
| Allen key (AF8) | 1 | Used to connect the AC cables to the inverter | 
| Allen key (AF10) | 1 | Used to attach and remove the cover of the inverter enclosure | 
| 3 Nm to 30 Nm torque wrench | 1 | Used to tighten bolted connections | 
| 10 mm and 13 mm socket | 1 | Example: For tightening grounding connections | 
| 8 mm hexagonal socket (recommended minimum length: 120 mm) | 1 | Used to assemble and disassemble pan head screws in the battery cabinet cover when replacing them with eye bolts | 
| Measuring device with a measurement range designed for the maximum AC and DC voltage of the inverter | 1 | Used to verify that no voltage is present at the inverter | 
| Measuring device with a measurement range up to at least 1000 V DC | (1) | Used to verify that no voltage is present at the battery | 
| Current clamp | 1 | For verifying that no voltage is present | 
| Laser thermometer | 1 | For measuring the internal temperature of the battery modules | 
| Press tool | 1 | Used to attach terminal lugs/bootlace ferrules to the DC lines | 
| Clean cloth | 1 | Used to clean terminal lugs | 
| Ethanol cleaning agent | 1 | Used to clean terminal lugs | 
| Brush | 1 | Used to clean aluminum conductor (only necessary if cable is made of aluminum) | 
| Protective grease | 1 | Used to apply to aluminum conductor (only necessary if cable is made of aluminum) | 
| Ripple control receiver | 1 | Only required if a ripple control receiver is to be installed | 
| External I/O system for the ripple control receiver | 1 | Only required if a ripple control receiver is to be installed and no I/O Module is to be used | 
| Laptop with two patch cables and one USB Ethernet adapter | 1 | Used for commissioning | 
| DIN rail | 1 | Used to mount the energy meter | 
| Only when using the JANITZA-SP / CLCON-PWRSUPPLY: external current transformers | 1 | Used to connect the energy meter | 
| Only when using a DC distributor: insulated bootlace ferrule (35 mm²) | 2 | For connecting the DC lines from the battery inverter to the DC distributor | 