Operating manual
SUNNY HOME MANAGER 2.0
- Information on this Document
- Safety
- Service Description
- Scope of delivery
- Product overview
- System Structure
- Mounting
- Connection
- Getting Started
- Configuration of the Sunny Home Manager system
- System data
- Configuring Strings
- Changing Operator Data
- Configuring parameters
- General Information about the Configuration of the Parameters
- Entering the Feed-In Tariff and Electricity Tariff
- Configuring Limitation of Active Power Feed-In
- Activating or Deactivating Grid Management Services
- Entering time period control for charging the battery-storage system
- Entering Peak Load Shaving
- Setting the Optimization Target
- Entering the Amount of CO2 Avoided
- Entering the Expected Yield
- General Information about the Configuration of the Parameters
- Releasing Data
- Device Administration
- Device Overview Tab
- Overview of New Devices Tab
- Configuring the Sunny Home Manager
- Selecting Simple or Extended Configuration
- Setting Automatic Updates
- Enabling Speedwire Encryption
- Configuring AVM FRITZ!Box Smart Home Control
- Configuring the display of the current status
- Configuring Niko Home Control
- Setting the Edimax Smart Plug
- Enabling System Communication Monitoring
- Setting the Data Request Interval
- Activating SMA Smart Home
- Configuring the External Current Transformer
- Changing the Meter Configuration
- Configuring Modbus Interfaces
- Selecting Simple or Extended Configuration
- Adding and Configuring the Inverter
- Adding switchgear and measuring devices
- Adding direct communicating loads
- Replacing the Sunny Home Manager
- Restarting the Sunny Home Manager
- Deleting devices from Sunny Portal
- Load Control
- Background Information
- Load Overview and Planning
- Configuring Switching Devices
- Configuring Load Characteristics
- Entering general information
- Selecting the Load Type
- Selecting Program Controllability
- Entering the Power Consumption
- Entering the Maximum Program Operating Time
- Entering the Minimum Switch-On and Switch-Off Time
- Setting the Priority of the Load
- Assigning a Switching Device
- Setting Measuring and Switching of the Assigned Device
- Setting Automatic Switch-Off
- Entering general information
- Configuring the Time Period
- Directly Controlling Loads
- Visualization of the energy management
- Monitoring of the Sunny Home Manager system
- Presentation of the Sunny Home Manager system
- User Management
- Password Information
- Troubleshooting
- Error message on the Sunny Home Manager
- Problems during Registration with the System Setup Assistant
- Problems with Integration of Devices
- Problems with Data Update
- Problems when Configuring and Controlling Radio-Controlled Sockets
- Using the Sunny Home Manager Assistant in case of network problems
- Messages in the system logbook
- Error message on the Sunny Home Manager
- Decommissioning
- Application Examples
- Technical Data
- Declarations of Conformity
- Contact