Load Overview and Planning
This menu page is divided into 2 areas:
Load overview - shows the loads that are configured for use with Sunny Home Manager.
You can view and change the configuration at any time or add new loads.Load planning - provides a graphical overview of the scheduled time periods in which the active loads must be operated (dark-colored bar) or can be operated (light-colored bar).
Loads with direct communication are not listed here.
Load overview and planning (example)
Position | Designation | Explanation |
---|---|---|
A | Filter options | Using the filter options, you can filter the list of loads. Selecting the option Active loads will hide the loads that are currently not assigned to a switching device and therefore not controlled by the Sunny Home Manager. |
B | Load list | List of loads which have been configured for use with the Sunny Home Manager. |
C | Load icon | Symbol of the load |
D | Name of load | Name of the load with assigned color A new color can be selected from the color palette. |
E | Type of load | Type of the load |
F | Status | Status of the load
The load is fully configured and can receive data.
Load is not assigned to a switching device.
|
G | Configuration | Opens the tab Name of Load, on which you can configure the load properties. |
H | Add loads | Using this button, you can add further loads to the Sunny Home Manager system. Smart appliances are recognized automatically by the configuration wizard and are displayed under Device overview > Overview of new devices. Following successful registration, the devices are displayed on the page Load Overview and Planning in the area Load Overview. |
I | Loads with time period setting | Only loads are shown here for which time periods were configured ( > Configuring the Time Period). |
K | Weekdays | For each individual weekday time periods can be configured for the loads. |
L | Configuration: CAN time period (light blue) | Can only be configured in systems with self-consumption The load will only be switched on during the time period if certain conditions have been met. |
M | Configuration: MUST time period (dark blue) | The load will always be switched on during the time frame. |