Setting the Priority of the Load


Here you can set which priority Sunny Home Manager should plan for the load Prioritizing Loads). This setting is coupled with the configuration of the time period.

Requirements:

  • The load must be connected to a switching device.

  • For the load, a time period of the type Load CAN be switched on must be set.

Procedure:

  1. Set the slider to the required level.