Setting the Priority of the Load
Here you can set which priority Sunny Home Manager should plan for the load ( > Prioritizing Loads). This setting is coupled with the configuration of the time period.
Requirements:
The load must be connected to a switching device.
For the load, a time period of the type Load CAN be switched on must be set.
Procedure:
- Set the slider to the required level.