Setting the Priority of the Load


Here you can set which priority Sunny Home Manager should plan for the load ( > Prioritizing Loads). This setting is coupled with the configuration of the time period.

Requirements:

  • The load must be connected to a switching device.

  • For the load, a time period of the type Load CAN be switched on must be set.

Procedure:

  1. Set the slider to the required level.