Adding an additional time period
If a load is not to run throughout the day, but rather at predefined intervals (e.g. pond pump), you must set up several consecutive time periods for this day. Here, the number of time periods equates to the number of intervals in which the load is to run.
Procedure:
- Select Configuration > Load Overview and Planning in the page and menu selection.
- In the line of the required load, in the column Configuration, select the symbol .
- In the tab Name of Load, select the button [Edit].
- Click on [Configure time period].
- Select Add time period .
- A new time period with the corresponding number will be displayed in the Time period overview.
- Make the required settings.
- Click on [Accept].
- Click on [Save].