Load MUST be switched on
The load must have a defined operating time.
Sunny Home Manager switches the load on and off within the configured time period.
You should select this option if the load should be operated in any case, for example on a specific day.

The load is also switched on if there is not sufficient self-generated PV energy available, i.e. energy required for the load to operate may be drawn from the utility grid.