Procedure for connecting to the SMA Data Manager M
Qualified person
This section describes the procedure for connecting the charging station to the SMA Data Manager M.
Requirements:
The SMA eCharger has the firmware version ≥ 2.5.9.R
The SMA Data Manager (EDMM-10 / EDMM-20) has the firmware version ≥ 2.5.9.R
It provides an overview of the steps, which must be performed in the prescribed sequence.
Procedure | See | |
---|---|---|
Commission the charging station. | ||
Establish a connection to the user interface of the charging station. There are various connection options to choose from for this:
| ||
If required, change the network configuration on the welcome page. The automatic network configuration recommended by SMA Solar Technology AG via DHCP server is activated by default. Only change the network configurations if the default configuration is not suitable for your network. | Commissioning Assistant | |
Carry out the configuration using the Commissioning Assistant. Select Charging station as System Manager in the device configuration. | Commissioning Assistant | |
Connect to the user interface of the charging station and enter the value [502] for the parameter Modbus TCP server port under Configuration > Parameters. | ||
Make further settings if necessary (e.g., configure multifunction relay). | ||
Commission the SMA Data Manager (EDMM-10 / EDMM-20). | See the product manual | |
Establish a connection to the user interface of the SMA Data Manager.
| See the product manual | |
To monitor the system in the Sunny Portal and view the data visually, create a user account in the Sunny Portal and create a system in the Sunny Portal or add devices to an existing system. |