Transfer to the operator
When installation and commissioning are complete, give all documentation to the operator. The operator must be instructed on the following points:
Safety when using the charging station
Appropriate procedures for inspecting and maintaining the charging station
Meaning of the LED indicators
Position and function of the AC miniature circuit breaker to switch off or restart the charging station
Contact partner in case of problems
Access to the Sunny Portal (powered by ennexOS)
SMA Energy App
Information on product registration