Transfer to the operator


When installation and commissioning are complete, give all documentation to the operator. The operator must be instructed on the following points:

  • Safety when using the charging station

  • Appropriate procedures for inspecting and maintaining the charging station

  • Meaning of the LED indicators

  • Position and function of the AC miniature circuit breaker to switch off or restart the charging station

  • Contact partner in case of problems

  • Access to the Sunny Portal (powered by ennexOS)

  • SMA Energy App

  • Information on product registration