Procedure for commissioning in combination with Sunny Home Manager 2.0


Qualified person

This section describes the procedure of commissioning a charging station that is used in systems with Sunny Home Manager.

It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Commission the charging station.

Commissioning the Product)

Establish a connection to the user interface of the charging station. There are various connection options to choose from for this:

  • Direct connection via Wi-Fi

  • Connection via Wi-Fi in the local network

  • Connection via Ethernet in the local network

Direct connection via Wi-Fi)

Connection in the local network)

If required, change the network configuration on the welcome page. The automatic network configuration recommended by SMA Solar Technology AG via DHCP server is activated by default. Only change the network configurations if the default configuration is not suitable for your network.

Commissioning Assistant

Carry out the configuration using the Commissioning Assistant. Select System Manager in the device configuration.

Commissioning Assistant

Register the Sunny Home Manager 2.0 and SMA Energy Meter as SMA Speedwire devices.

Commissioning Assistant

Add the charging station as a device to a Sunny Portal system with Sunny Home Manager 2.0.

SUNNY PORTAL powered by ennexOS - User Manual