Time-based grid fees in accordance with Section 14a, Module 3


If you use Module 3 in accordance with Section 14a EnWG, you can specify different grid fees for different time periods. Deviations from the standard load tariff can automatically be added to or deducted from the configured electricity price.

Procedure:

  1. Go to Tariffs via the Configuration side menu.
  2. In the area Time-based grid fees in accordance with Section 14a, Module 3, select [Configure].
  3. You can configure your standard load tariff and additional tariff sections with deviating grid fees.
  4. Activate time-based grid fees.
  5. Under [ Edit], enter the gross price (incl. value-added tax).
  6. Under [Add tariff section], the tariff period, time window and grid fees can be configured.