Non-program-controlled loads


A non-program-controlled load must be able to switch on and off as needed and have a flexible switch-on time. The Sunny Home Manager 2.0 can select one or more periods within the user-defined time frame in which it can switch the load on or off Controlling Loads via a Time Period).

Examples of non-program-controlled loads:

  • Heat pump

  • Heating element

    Also see: