Configuring indirectly communicating loads


Qualified person

All settings for configuration of a load are made via Sunny Portal powered by ennexOS.

Procedure:

  1. Go to Device management via Configuration.
  2. In the context menu of the measuring/switching device, select Configure as load.
  3. Select the energy load as needed Types of Loads).
  4. In the section Integration into the energy management, select the type of integration as needed. To change these settings later, you must first delete the load from the system and then reconfigure it.
  5. Select [Continue] to confirm.
  6. Give the load a designation in the field Device name.
  7. If the load type was not defined by the energy load, select the load type via the drop-down menu.
  8. Select the maximum power consumption Power consumption of loads).
  9. Set the Priority of the load Prioritizing Loads).
  10. Configure the program controllability Selecting Program Controllability of Directly Communicating Loads).
  11. If the load is program-controlled, enter the maximum program runtime Maximum Program Runtime of Directly Communicating Loads).
  12. If the load is not program-controlled, enter the minimum switch-on/off time Minimum Switch-On and Switch-Off Times).
  13. As needed, activate automatic switching for the non-program-controlled load or heating rod via the button and then define the limit value and the detection time for disconnection Load with Automatic Switching).
  14. Select [Continue] to confirm.
  15. Configure the time period Information about the configuration of time periods).
  16. Make the optional settings.