Load control as per §14a EnWG (German Energy Act)
As required by your grid operator, the system can ensure that the requirements for load control in accordance with §14a of the German Energy Act (Energiewirtschaftsgesetz – EnWG) are implemented in your PV system. This applies to controllable consumption units with a grid connection capacity of more than 4.2 kW. Control is achieved via an FNN control box.
Procedure:
- Open the menu item Grid management services under Configuration and go to Load control in accordance with §14a German Energy Act (EnWG).
- Configure the settings based on requirements (Default setting Off).