Configuring directly communicating loads


Qualified person

All settings for configuration of a directly communicating load (SEMP/EEBus) are made via Sunny Portal powered by ennexOS.

Procedure:

  1. Add the device to the system Adding direct communicating loads).
  2. Go to Device management via Configuration.
  3. Open the dialog Display device properties via the context menu of the device or load.
  4. Activate editing mode via in the section Device details.
  5. Enter the device details.
  6. Confirm with [Save].
  7. Activate editing mode via in the section Device control.
  8. Configure the priority of the load.
  9. Configure the min. PV share or max. energy costs in the section Optional energy demand.
  10. Confirm with [Save].

    Also see: