Requirements for Limiting of the Active Power Feed-In
Observe the following requirements for the configuration of the limiting of the active power feed-in ( > Configuring Limitation of Active Power Feed-In):
Requirements | Setting |
---|---|
The grid operator requires a limitation to a percentage of the nominal system power. | Select % of PV array power and enter the required percentage. |
The grid operator requires a limitation to a maximum active power in kW. | Select max. xx kW and enter the maximum permitted active power in kW. |
The grid operator requires limiting of the active power feed-in to 0% or 0 kW ("zero export"). | Select the option button Zero Export. |
If you have activated the zero export function, also observe:
Requirements | Setting |
---|---|
If your system has a battery or hybrid inverter, and you have set the nominal system power to a correspondingly low value, you can use the surplus energy to charge the battery-storage system. | Activate Including the battery inverter. |