Selecting Program Controllability of Directly Communicating Loads


Qualified person

  1. Select the load type "Other."
  2. Select Integration into the energy management as needed.
  3. Select [Continue] to confirm.
  4. Define the Device information. In doing so, observe the information in Sunny Portal powered by ennexOS.
  5. In the section Load is program-controlled?, select [Yes] or [No] based on the load.
  6. Define the switch-on and switch-off times as needed.
  7. Select [Continue] to confirm.
  8. Configure the further settings as needed.