Commissioning procedure for a single battery cabinet
This section describes the procedure for commissioning the SMA Storage XL with one battery cabinet. It provides an overview of the steps, which must be performed in the prescribed sequence.
Procedure | See | |
|---|---|---|
Check that the installation and electrical connection work have been completed. | ||
Commission the battery. | ||