Commissioning procedure for a single battery cabinet


This section describes the procedure for commissioning the SMA Storage XL with one battery cabinet. It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Check that the installation and electrical connection work have been completed.

Checking the Mounting and Connection Work)

Commission the battery.

Commissioning an Individual Battery Cabinet)

    Also see: