Electrical Connection Procedure with a Single Battery Cabinet
This section describes the procedure for the electrical connection of the product when there is just one battery cabinet in the system. It provides an overview of the steps, which must be performed in the prescribed sequence.
Procedure | See | |
|---|---|---|
Ensure that the requirements for the electrical connection are fulfilled. | ||
Ground the battery cabinet. | ||
Connect the AC cables to the inverter. | ||
Connect the network cables to the inverter. | ||
Connect the battery communication cables for CAN to the inverter. | ||
Connect the DC lines to the inverter. Record the device type and serial number of the inverter in the commissioning report. | ||
Connect the AC cable to the battery cabinet. | ||
Connect the DC cables to the battery cabinet. | ||
Connect the battery communication system to the inverter. | ||
Connect the energy meter (Energy Meter or Power Quality Analyzer). | See manual for the energy meter | |
Optional: Connect the SMA Data Manager M. | See manual for the SMA Data Manager M | |
Also see:
- AC Connection
- Connecting the AC Cable
- Connecting the DC Cables
- Communication Connection
- Configuring secondary battery cabinets
- Configuring secondary battery cabinets
- Connecting the CAN communication between the battery cabinets
- Commissioning multiple battery cabinets
- Connecting the battery communication cable for CAN
- Commissioning an Individual Battery Cabinet
- Commissioning an Individual Battery Cabinet
- Earthing the battery cabinet
- Connecting the Network Cables
- Requirements for the electrical connection
- Connecting the DC Cables