Positioning the Outdoor Version of the Battery Cabinet
Qualified person
Requirements:
- A sound-insulated foundation must have been prepared.
- The requirements on the installation site and on the foundation must have been complied with.
Procedure:
- On the prepared foundation, pre-drill and clean holes for the sleeve anchors included in the scope of delivery.
- Insert the sleeve anchors and drive in the expansion sleeves.
- If necessary, use a crane to transport the battery cabinet to the installation site. When doing so, use the available eye bolts and ensure that the lifting gear is correctly attached.
- Position the battery cabinet over the sleeve anchors such that it sits on the holes in the frame.
- Attach the battery cabinet to the sleeve anchors on the foundation.
