Positioning the Outdoor Version of the Battery Cabinet


Qualified person

Requirements:

  • A sound-insulated foundation must have been prepared.
  • The requirements on the installation site and on the foundation must have been complied with.

Procedure:

  1. On the prepared foundation, pre-drill and clean holes for the sleeve anchors included in the scope of delivery.
  2. Insert the sleeve anchors and drive in the expansion sleeves.
  3. 16123805196
  4. If necessary, use a crane to transport the battery cabinet to the installation site. When doing so, use the available eye bolts and ensure that the lifting gear is correctly attached.
  5. Position the battery cabinet over the sleeve anchors such that it sits on the holes in the frame.
  6. Attach the battery cabinet to the sleeve anchors on the foundation.