Starting the Generator via the User Interface


The basic procedure for changing operating parameters is explained in another section Changing Operating Parameters).

Requirement:

  • The Sunny Island must be able to control the generator via a control cable.

Procedure:

  1. Select Generator > Generator.
  2. Set the parameter Manual generator control to Start.
  3. The electricity generator starts and runs until you stop it again.
  4. To start the generator and leave it running for one hour, perform the following steps.
    • Select Generator > Operation >.

    • Set the parameter Reason for requesting generator to Run1h.

  5. The generator starts. If there is no generator request after one hour, the Sunny Island stops the generator.