Starting the Installation Assistant
Qualified person
The installation assistant leads you step-by-step through the steps necessary for the initial configuration of the inverter.
Layout of the installation assistant

Layout of the installation assistant (example)
Position |
Designation |
Description |
---|---|---|
A |
Configuration steps |
Overview of the installation assistant steps. The number of steps depends on the type of device and the additionally installed modules. The current step is highlighted in blue. |
B |
User information |
Information about the current configuration step and the setting options of the configuration step. |
C |
Configuration field |
You can make settings in this field. |
Requirement:
-
Without the SMA Grid Guard code settings for the utility grid are only possible within the first ten operating hours (see "Measured Values and Parameters" at www.SMA-Solar.com) After completion of the first ten operating hours, the SMA Grid Guard code must be available (see "Application for SMA Grid Guard Code" at www.SMA-Solar.com).
Procedure:
- Open the user interface ( > Establishing a connection to the user interface).
- Log in as Installer.
- Select the menu User Settings ( > Start Page Design of the User Interface) on the start page of the user interface.
- In the context menu, select [Starting the installation assistant].
- The installation assistant will open.