Changing the Warm-Up Time for the Generator


2049622028

The basic procedure for changing operating parameters is explained in another section Changing Operating Parameters).

Relation between warm-up time and termination of generator start:

The generator management measures the time between the generator start and the beginning of the warm-up time. If a maximum time is exceeded, the generator management system terminates the generator start. The maximum time to start termination is double the warm-up time plus an additional two minutes.

With some generator types, the generator only switches the voltage to the output of the generator after the internal warm-up time has expired. During this time, the generator management is unable to recognize a valid generator voltage. If the warm-up time is set too low, the generator management terminates the generator start before the internal warm-up time has expired.

Procedure:

  1. Select Generator > Operation.
  2. Set the parameter Warm-up time of generator in accordance with the generator properties.
  3. Generator properties

    Setting Parameters

    Without internal warm-up time

    • Set the desired warm-up time.

    With internal warm-up time

    Autostart compatible

    • Set the warm-up time to be at least half the internal warm-up time of the generator.

    Without an autostart function

  • The generator start is not terminated prematurely.