Create a new schedule


Schedules control the use of operating modes. If no schedule is created, the operating mode Maximum increased self-consumption is always active.

Requirement:

Procedure:

  1. Select the menu item Energy management in the menu Configuration.
  2. In the Schedules section, select the New schedule button.
  3. Set the name of the schedule, standard operating mode, and time period.
  4. Click on [Next].
  5. Use the [New time window] button to define which operating mode should be used in which time windows. If no time slots are defined, the default operating mode is active for the entire duration of the schedule.

    Also see: