ENGLISH
ENGLISH
DEUTSCH
ESPAÑOL
FRANÇAIS
ITALIANO
NEDERLANDS
Technical Data
General Data
DC input of PV
Battery DC input
AC output
Digital inputs
Digital output (multifunction relay)
Communication
Data Storage Capacity
Efficiency
Protective Devices
Climatic Conditions
Equipment
Disposal
General Data
Table of Contents
toggle menu
Information on this Document
Validity
Target Group
Content and Structure of this Document
Levels of Warning Messages
Symbols in the Document
Typographies in the document
Designations in the Document
Additional Information
Safety
Intended Use
IMPORTANT SAFETY INSTRUCTIONS
Scope of Delivery
Scope of delivery for SBSE3.6-50 / SBSE4.0-50 / SBSE5.0-50 / SBSE6.0-50
Scope of delivery for SBSE8.0-50 / SBSE9.9-50
Product overview
Device function of Sunny Boy Smart Energy
Product Description
Symbols on the Product
Interfaces and Functions
User Interface
Device Key (DEV KEY)
Diagnostic function
Increased self-consumption
Energy Monitoring
Energy Maximizer
Energy Planner
Peak load shaving
SMA ArcFix
Modbus
Grid Management Services
Secure Power Supply Operation
Parallel PV input operation
SMA Dynamic Power Control
SMA Premium
SMA ShadeFix
SMA Smart Connected
SMA Speedwire
Protective Battery Charging
Active Power Limitation
Wi-Fi
Wi-Fi connection to SMA 360° app and SMA Energy app
LED Signals
Mounting
Requirements for Mounting
Requirements for the Mounting Location
Permitted and prohibited mounting positions
Dimensions for mounting SBSE3.6-50 / SBSE4.0-50 / SBSE5.0-50 / SBSE6.0-50
Mounting Dimensions for SBSE8.0-50 / SBSE9.9-50
Recommended clearances for mounting
Install cable gland for backup connection
Mounting the Inverter
Spacer Installation
Electrical Connection
Requirements for the electrical connection
Equipotential Bonding
Residual-current monitoring unit (RCMU)
Overvoltage category
Permitted grid configurations
Requirements for the PV modules per input
PV connection options
Cable Requirements
AC cable requirements
Requirements for the PV cables
Requirements for the power cable for backup operation
Requirements for signal cables for backup operation, MFR, and fast stop
Network cable requirements
Battery Communication Cable Requirements
Requirements for the Battery Power Cables
Requirements for the grounding cable for additional protective grounding
Overview of the Connection Area
View from Below
Interior View
Connecting the Utility Grid
Connect signal cables for backup operation
Connect the power cable for backup operation
Connecting the Network Cables
Connecting the Data Cable of the Battery
Connection to the Multifunction Relay
Digital output (MFR)
Pin assignment MFR
Connect signal source to MFR
Connection to digital input GSI
Digital Input GSI
Circuitry overview GSI
Connecting Signal Source to Digital Input GSI
Mounting the WLAN Antenna
Connecting the PV Array
Connecting the power cable of the battery
Connecting additional protective grounding
Commissioning
Commissioning Procedure of System with the SMA 360° App
Commissioning via User Interface
Procedure for commissioning as System Manager
Procedure for commissioning in systems with Sunny Home Manager
Procedure for commissioning as a subordinate device
Switching the Inverter On
Configuring the System with the SMA 360° App
Checking the Secure Power Supply Operation
Operation
Operation notes
Use of the user interface powered by ennexOS
Changing parameters
Rated Residual Current of the Residual-Current Device
Setting the Parallel Operation of the PV Inputs
Configuring the Digital Input for Fast Stop
Overview of Grid Types
Disconnecting the Inverter from Voltage Sources
Remove enclosure lid
Check that the inverter is de-energized
Cleaning
Troubleshooting
Event messages
Event 101
Event 102
Event 103
Event 105
Event 202
Event 203
Event 206
Event 301
Event 302
Event 401
Event 404
Event 501
Event 507
Event 601
Event 701
Event 901
Event 1001
Event 1101
Event 1302
Event 1501
Event 3302
Event 3303
Event 3401
Event 3402
Event 3407
Event 3410
Event 3411
Event 3501
Event 3523
Event 3601
Event 3701
Event 3901
Event 3902
Event 4013
Event 4014
Event 4015
Event 4016
Event 4017
Event 4301
Event 6001-6499
Event 6501
Event 6502
Event 6509
Event 6511
Event 6512
Event 6602
Event 6606
Event 6633
Event 6801
Event 6901
Event 7001
Event 7002
Event 7014
Event 7015
Event 7702
Event 7703
Event 8003
Event 8104
Event 8205
Event 8503
Event 8708
Event 8709
Event 8710
Event 9007
Event 9034
Event 9037
Event 9038
Event 9101
Event 9102
Event 9107
Event 9202
Event 9203
Event 9308
Event 9342
Event 9345
Event 9350
Event 9394
Event 9395
Event 29252
Event 29254
Calculating the insulation resistance
Checking the PV System for Ground Faults
Manual restart after electric arc
Create Diagnostics Data
Decommissioning
Disconnecting the Terminals from the Inverter
Disassembling the Inverter
Replacing the Product
Disposal
Technical Data
General Data
DC input of PV
Battery DC input
AC output
Digital inputs
Digital output (multifunction relay)
Communication
Data Storage Capacity
Efficiency
Protective Devices
Climatic Conditions
Equipment
EU Declaration of Conformity
Contact