Scope of delivery for SBSE3.6-50 / SBSE4.0-50 / SBSE5.0-50 / SBSE6.0-50


Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of delivery is incomplete or damaged.

12403798540

Components included in scope of delivery

Position

Quantity

Designation

A

1

Inverter

B

1

Mounting bracket

C

1

Left side cover

D

1

Right side cover

E

1

Allen key 1/4

F

1

2-pole connector for the signal cable of the backup operation

G

1

4-pole connector for connecting the energy meter per RS485

H

1

3-pole connector for connecting the multifunctional relay

I

3

Terminal blocks for connection of PV modules

J

3

M32x1.5 cable gland with four-hole cable support sleeve with 2 differently sized enclosure openings for the communication connections

K

2

M32x1.5 cable gland with four-hole cable support sleeve with 4 equally sized enclosure openings for the DC connection

L

1

M32x1.5 cable gland with seal insert for connection to the utility grid

M

1

Cable gland M25x1.5 with two-hole cable support sleeve for connection of battery power cables

N

1

Cable gland M20x1.5 with sealing plug for connection of backup power cable

O

1

Ferrite

P

1

Cable tie

Q

1

Screw and washer assembly M5x12 for additional protective grounding

R

1

Documentation package consists of:

  • Safety information booklet

  • Quick reference guide poster with illustrated instructions for initial installation and commissioning

  • Sheet with a password label contains the following information:

    • PIC (Product Identification Code) identification key for registering the system in Sunny Portal

    • RID (Registration Identifier) registration ID for registering the system in Sunny Portal

    • Wi-Fi password WPA2-PSK (WiFi Protected Access 2 - Preshared Key) for direct connection to the product via Wi-Fi

    • Device Key (DEV KEY) for resetting the administrator password