Activating the energy management
Qualified person
Requirements:
A suitable energy meter is installed and configured at the point of interconnection within the system.
A battery is available in the system and has been put into operation.
The user interface is open and you are logged in.
Procedure:
- Select the menu item Energy management in the menu Configuration.
- Select Advanced settings.
- Select Control by SMA energy management.
- Finish by clicking [Save].
Also see: