Setting load management with an external meter


For external metering, the following meters can be used via Modbus TCP:

Manufacturer

Model

Information

SMA

SMA COM-EMETER-A-20 / SMA COM-EMETER-B-20

Select TQ EM300-LR / EM410 or EM420

Janitza

UMG 512/96 PRO

Port 502

Janitza

UMG 604 PRO

Port 502, as of firmware 5.32, Modbus TCP can also be used for EDMM-10 / EDMM-20

Janitza

UMG 605 PRO

Port 502

Phoenix Contact

EEM-MB371/MB370

Port 502

Siemens

7KM2200

Port 502, Modbus TCP can also be used for EDMM-10 / EDMM-20

TQ

EM300-LR

Port 502

TQ

EM410 / EM420

Port 502

Requirements:

  • The user interface must be open and you must be logged in.

Procedure:

  1. In the navigation area, click on [LOAD MANAGEMENT].
  2. Under [Dynamic Load Management] > Dynamic Load Management - DLM Master/Slave select [DLM Master (With Internal DLM-Slave)].
    Information: The main device (DLM master) may only be configured once. All other charging stations must be configured as a subordinate device (DLM slave)Setting the Subordinate Device (Slave) for Load Management).
  3. Under DLM External Measurement and Control Inputs>External Meter Support select [On].
  4. Set the available current under EVSE Sub-Distribution Limit (L1/L2/L3) [A].
  5. Set the available current under Operator EVSE Sub-Distribution Limit (L1/L2/L3) [A].
  6. Set the current limit of the point of interconnection under [Main Distribution Limit (L1/L2/L3) [A]].
  7. Set the safety margin for external load under [External Load Headroom (L1/L2/L3) [A]].
  8. Set the assumed load in case of failure under External Load Fallback (L1/L2/L3) [A]. If the value 9999 is input, all charging points will be switched off in case of failure.
  9. Set the type of dynamic load control under External Meter Location.
  10. Under Meter configuration (Second), select the meter for the external measurement.
  11. Under IP address of second meter, set the IP address of the energy meter.
  12. Under Port number of second meter, set the port number.
  13. Click on [Save] to save the changes and [Restart].
  14. Under [Diagnostics] > [Energy Manager] > [Second Meter] the external meter can be checked.