ENGLISH
DEUTSCH
ENGLISH
ESPAÑOL
FRANÇAIS
ITALIANO
NEDERLANDS
Safety
Intended Use
Measuring accuracy notes in accordance with the type examination certificate
IMPORTANT SAFETY INFORMATION
Designations in the Document
Intended Use
Table of Contents
toggle menu
Information on this Document
Validity
Target Group
Content and Structure of this Document
Levels of Warning Messages
Symbols in the Document
Typographies in the document
Designations in the Document
Safety
Intended Use
Measuring accuracy notes in accordance with the type examination certificate
IMPORTANT SAFETY INFORMATION
Scope of Delivery
Scope of delivery, charging stand
Product overview
System Overview
Circuitry Overview
Communication Overview
Product Description
Symbols on the Product
Interfaces and Functions
LED Signals
Mounting
Requirements for Mounting
Wall Mounting
Mounting the charging stand
Electrical Connection
Overview of the Connection Area
View from Below
Interior View
Connecting the Utility Grid
Connecting the Network Cables
Connection in Accordance With EnWG §14a Requirements
Commissioning
Check the
Commissioning the Product
Operation
Establishing a connection to the user interface
Access addresses for the product in the local network
Establishing a connection via Ethernet or cellular phone in the local network
Establishing a connection via USB in the local network
Design of the User Interface
User Roles and User Rights
Updating Firmware with Update File via the User Interface
Setting Network
Setting the network via Ethernet
Setting the Network Via Cellular Phone
Setting the charging current
Setting the current limit
Setting Power Reduction in Accordance With the Requirements of EnWG §14a
Setting the phases and phase position
Enabling HTTPS
Setting up the backend
Setting up the backend via Ethernet
Setting up the backend for cellular phone
Register as a new user in the eMobility Portal
Log in to eMobility Portal as an existing user
Dynamic load management
Basic Information
Setting load management without external meters
Setting load management with an external meter
Setting the Subordinate Device (Slave) for Load Management
Prioritizing Subordinate Devices (Slave)
Setting the Solar Charging Mode
Setting Time-Based Charging
RFID Administration
Teaching Additional RFID Cards
Enable the charging process in case of backend failure
Enable Free Charging
Changing the Password
Connecting to the System Manager
Starting and Ending the Charging Process
Overview of Display and Control Elements
Starting the Charging Process
Ending the Charging Process
Verifying the Charge Data
Disconnecting the product from voltage sources
Cleaning the Product
Troubleshooting
Event messages
Decommissioning the Product
Maintenance
Procedure for Receiving a Replacement Device
Technical Data
Accessories
Contact
EU Declaration of Conformity