Commissioning the Product
 Qualified person
Qualified person
Requirements:
- The AC circuit breaker must be correctly rated and mounted. 
- The product must be correctly mounted. 
- All cables must be correctly connected. 
- Unused enclosure openings must be sealed tightly with sealing plugs. 
Procedure:
- Close the cable compartment and tighten the screws on the cable compartment cover (TX 30, torque: 4.3 Nm).
- Switch on all 4 DC load-break switches.
- Switch on the AC circuit breaker.
- Green LED is flashing. The inverter is waiting for the input conditions.
- After approx. 90 seconds, the green LED is permanently on. The inverter is feeding in.
- If the green LED is still flashing after 90 seconds, the conditions for activating feed-in operation are not yet met. As soon as the conditions for feed-in operation are met, the inverter starts with the feed-in operation and the green LED will light up continuously.
- If the red LED lights up, an event has occurred. Use the event number to find out which event has occurred and, if necessary, initiate countermeasures.
- Ensure that the inverter feeds in correctly.