Procedure for Installing and Commissioning the System


The procedure for installation, electrical connection, and commissioning of the system is described in the following. It provides an overview of the steps, which must be performed in the prescribed sequence.

Procedure

See

Ensure that the requirements for the installation of the system components are fulfilled.

Requirements for Mounting)

Mount the inverter.

Mounting the Inverter

Ensure that the requirements for the electrical connection are fulfilled.

Requirements for the electrical connection)

Install the SMA Energy Meter or Sunny Home Manager.

Manual of the SMA Energy Meter or Sunny Home Manager

Mount the battery.

Manual for the battery

Connect to utility grid.

Connecting the Utility Grid)

Connect the switch and socket for secure power supply operation.

Connect the switch for secure power supply operation)

Connect the socket for secure power supply operation)

Connect the network cables to the inverter.

Connect SMA Energy Meter or Sunny Home Manager to the inverter.

Connect the data cables of the battery.

Connect switch for fast stop to digital input (optional).

Connection to digital input GSI)

Connect to the multifunction relay (optional).

Connection to the Multifunction Relay)

Connect the PV modules to the inverter.

Connect the battery power cables.

Connect the additional grounding to the inverter.

Connecting Additional Grounding

Commission the system.

Commissioning)

Check secure power supply operation.

Checking the Secure Power Supply Operation)