Design of the Foundation for the Outdoor Version of the Battery Cabinet


When constructing the foundation, it must be taken into account that a suitable base plate may be required, depending on local conditions. When designing the base plate or foundation, the routing of cables and the condensate hose must be taken into account. The condensate hose must be connected to a suitable pipe through which the accumulating condensation can be drained.

Furthermore, in accordance with the requirements of the German Regulation on Facilities for Handling Substances Hazardous to Water (AwSV), it must be determined whether a collecting tray is required. The specific design must be coordinated with the locally responsible building authority.

15977647244

Design of the foundation for the outdoor version: The left-hand figure shows a cross-section from the front; the right-hand figure shows the top view of the foundation with the battery cabinet (dimensions in mm)

Position

Designation

Dimension

A

Anchoring points for the sleeve anchors included in the scope of delivery

-

B

Protruding condensate hose
Adequate drainage via canalization or a gravel bed must be planned for.

Enclosure openings for the communication cables to the inverter or to the secondary battery cabinets and AC connection cables for the battery cabinets.

Length of the protruding condensate hose approx. 15 cm, Ø 20 mm

C

Enclosure openings for the DC connection to the inverter or to the secondary battery cabinets.

-