System Components

Product overview – indoor version

Product overview – outdoor version
Position | Designation |
|---|---|
A | Indoor or outdoor version of the battery cabinet High-voltage box (including Battery Management System), control panel and battery modules are already installed. |
B | Sunny Tripower Storage X 30 (STPS30-20) / Sunny Tripower Storage X 50 (STPS50-20) Battery inverter for parallel grid operation that converts the direct current supplied by a battery into grid-compliant three-phase current. When used as System Manager, the battery inverter in conjunction with an energy meter (Energy Meter or Power Quality Analyser) can take over the closed-loop control at the point of interconnection and provide open or closed-loop control of subordinate devices. The System Manager also takes over system monitoring and communication to the Sunny Portal powered by ennexOS. |
C | Optional: Commercial Energy Meter *required for operation. Must be ordered separately.1):
The energy meter determines electric measured values at the grid connection point and transmits the measured data to the System Manager. |
D | Optional: SMA Data Manager M (EDMM-20) Data logger for monitoring and controlling the system. In systems with more than ten devices, the SMA Data Manager M performs the role of the System Manager. |
1) Required for operation. Must be ordered separately.