Switching the battery cabinet on
Qualified person
- Insert the DC circuit breaker from the scope of delivery into the designated base. When doing so, ensure that the handle of the DC circuit breaker is in the open position.
- Close the handle until it snaps securely into place.
- Press the locking mechanism on the handle downward until it clicks into place.
- Indoor version: Ensure that the AC supply is connected to the terminals and switched on.
- Outdoor version: Switch on the circuit breakers on the inside left (AC Main Breaker, SPD2 Breaker, Air Condition Power, Gas Fan Power). In the process, make sure that the AC supply is connected to the terminals and switched on.
- Switch on the QF, QF1 and QF2 circuit breakers on the high-voltage box. The switch extension included in the scope of delivery can be used for operating QF more easily.
- Indoor version: Press and hold the On/Off button to the left of the display for 5 seconds.
- Outdoor version: Press and hold the On/Off button below the display for 5 seconds.





Also see: