Requirements for Commissioning
The AC circuit breaker must be correctly rated and mounted.
The AC grid and AC backup must be connected correctly and must not be interchanged.
The product must be correctly mounted.
All cables must be correctly connected.
The Wi-Fi antenna must be mounted.
The battery must be commissioned and the latest firmware must be installed (see battery manufacturer's documentation).