Requirements for Commissioning


  • The AC circuit breaker must be correctly rated and mounted.

  • The AC grid and AC backup must be connected correctly and must not be interchanged.

  • The product must be correctly mounted.

  • All cables must be correctly connected.

  • The Wi-Fi antenna must be mounted.

  • The battery must be commissioned and the latest firmware must be installed (see battery manufacturer's documentation).