Disassembling the Inverter


Qualified person

To decommission the inverter completely upon completion of its service life, proceed as described in this Section. If the inverter is defective and you have received a replacement device, observe the information on Replacing the Product with a Replacement Device)

CAUTION

Risk of injury due to weight of product

Injuries may result if the product is lifted incorrectly or dropped while being transported or mounted.

  1. Transport and lift the product carefully. Take the weight of the product into account.
  2. Always have two persons mount and disassemble the product.
  3. Wear suitable personal protective equipment for all work on the product.

Procedure:

  1. Unscrew the left- and right-hand pan head screws M4x14 used to secure the inverter to the wall mounting bracket (PH2).
  2. If the protective cover for the connection area is still in place, reattach the protective cover to the inverter. Otherwise, protect the connection area with another sturdy cover.
  3. Remove the inverter by lifting it vertically up and off the wall mounting bracket. Remove the wall mounting bracket.
  4. Unscrew the screws for fastening the wall mounting bracket and remove the wall mounting bracket. Ship or store the inverter.
  5. If the inverter is to be stored or shipped, pack the inverter, the AC connectors, the DC connectors, the antenna, the RJ45 protective sleeve, the battery connection cables, the connector for connecting the battery communication and the digital inputs and outputs, and the wall bracket. Use the original packaging or packaging that is suitable for the weight and dimensions of the inverter. Dispose of the inverter.
  6. Dispose of the inverter in accordance with the locally applicable disposal regulations for electronic waste Disposal).

    Also see: