Setting Zero Export


Qualified person

To set the phase-exact zero feed-in, the corresponding parameters must be set in the subordinate inverters and the system.

Requirements:

  • The user interface must be open and you must be logged in as Installer.

  • The parameter External active power setting, limitation of change rate must be disabled in the subordinate inverter.

  • The parameter External active power setting 2, limitation of change rate must be disabled in the subordinate inverter.

  • The parameter External active power setting, nominal value filter must be disabled in the subordinate inverter.

  • The parameter External active power setting 2, nominal value filter must be disabled in the subordinate inverter.

  • Optimized closed-loop/open-loop control must be activated under Operating mode for active power Configuring active and reactive power setpoints).

Procedure:

  1. Select the system in the focus navigation.
  2. Select the menu Configuration.
  3. Select the menu item Grid management services.
  4. Select Configuration & activation under Active and reactive power.
  5. Open the sub-item Grid operator specifications in the Active power area.
  6. Activate Manual setpoint for active power limitation.
  7. Activate Phase-exact zero active power feed-in.
  8. Select [Next] and complete the settings on grid management services.
  9. Click on [Save].

    Also see: