Configuration of SG Ready interface


The product allows to control devices with an SG Ready interface (e.g. heat pumps) via digital outputs.

SG Ready has four switching states that are transferred via two binary digital signals:

  1. 10: Blocked operation

  2. 00: Normal operation

  3. 01: Encouraged operation

  4. 11: Ordered operation

At minimum, the heat pump must support the following operating states: 10: Blocked operation, as well as either 01: Encouraged operation or 11: Ordered operation.