Operating manual
SUNNY ISLAND 4.4M / 6.0H / 8.0H
- Information on this Document
- Safety
- Scope of delivery
- Product overview
- Mounting
- Electrical Connection
- Content and Structure of the Section
- Overview of the Connection Area
- Inserting the Micro SD Card
- Connecting the Grounding Conductor with a Grounded Battery
- Connecting the Components
- Connecting the Battery Fuse to the Sunny Island
- Connecting the Utility Grid in the System for Increased Self-Consumption
- Connecting an Automatic Transfer Switch in the Battery Backup System
- Connecting the Stand-Alone Grid or Multicluster-Box 6 / 36
- Connection of Multicluster-Box 12 (MC-Box-12.3-20)
- Connecting the Generator in an Off-Grid System
- Communication Connection
- Connecting the Data Cable for Speedwire Network
- Connecting the Data Cable of the Lithium-Ion Batteries
- Connecting the Data Cable for the Internal Communication of the Cluster
- Connecting the Data Cable of the Multicluster-Box
- Connecting Control and Measuring Cables of the Multicluster-Box
- Connecting the Data Cables for Multicluster Communication
- Connecting the Battery Temperature Sensor
- Connecting the Battery Current Sensor in the Off-Grid System
- Connecting the Control Cable for Autostart Generators
- Connecting a Signaler for Generators Without an Autostart Function
- Connecting Load-Shedding Contactors
- Connecting the Time Control for External Processes
- Connecting Message Devices for Operating States and Warning Messages
- Connecting the Battery Room Fan
- Connecting the Electrolyte Pump for the Battery
- Connecting the Control Cable for the Use of Excess Energy in an Off-Grid System
- Connecting the Signal Cable of the External Generator Request
- Connecting the Battery Fuse to the Sunny Island
- Connecting the Cables
- Checking the Wiring
- Sealing and Closing the Sunny Island
- Inserting the Fuse Links in the Fuse Switch-Disconnector
- Content and Structure of the Section
- Commissioning
- Commissioning Procedure
- Commissioning the Inverter
- Performing Basic Configuration of the Installation Assistant
- Configuring the Country Data Set
- Changing Thresholds for Systems for Increased Self-Consumption
- Battery Management
- Safety When Setting the Battery Management Parameters
- Lead-acid batteries: Adjust the battery management to the battery
- Lithium-ion batteries only: Setting equalization charge of the batteries
- Battery Use Regarding Systems for Increased Self-Consumption
- Changing the Battery Usage Regarding Battery-Backup Systems without Increased Self-Consumption
- Changing the Battery Protection Mode in Off-Grid Systems
- Energy-saving mode
- Configuring the Resistance of the Battery Cable
- Setting the Control of the Battery Room Fan
- Safety When Setting the Battery Management Parameters
- Energy management
- Generator Management
- Configuration of the Thresholds for Generator Connection
- Changing the Type of the Generator Interface
- Configuring Generator Run Times
- Configuring the Generator Request
- Changing the Automatic Generator Operation
- Changing a State-Of-Charge-Dependent Generator Request
- Setting a Time-Dependent Generator Request
- Configuring the Load-Dependent Generator Request
- Time-Controlled Generator Requesting
- Changing the Generator Request via the Charging Process of the Battery
- Setting an External Generator Request
- Configuring the Procedure in the Event of a Generator False Start
- Off-Grid System
- Multifunction Relay
- Complete Commissioning.
- Commissioning Procedure
- Operation
- Establishing a connection to the user interface
- Logging In and Out of the User Interface
- Start Page Design of the User Interface
- Changing the Password
- Starting the Installation Assistant
- Changing Operating Parameters
- Setting Time-Controlled Inverter Operation in Off-Grid Systems
- Activate WPS Function
- Switching WLAN On and Off
- Configuring the Energy Meter
- Configuring the Modbus Function
- Supplementary Information
- Activating the Smart Inverter Screen
- Starting and Stopping the System
- Data Storage and Firmware Update
- Manually Controlling the Generator
- Disconnecting the Inverter from Voltage Sources
- Cleaning and Maintenance
- Cleaning and Checking the Sunny Island Inverter Enclosure
- Checking the Function
- Checking the Connections
- Cleaning the Fans
- Checking and Maintaining the Battery
- Emergency charge mode after automatic shutdown
- Changing Slave Addresses in a Cluster
- Replacing the Battery
- Replacing the Micro SD Card
- Opening and Closing the Inverter
- Recommissioning the Inverter
- Cleaning and Checking the Sunny Island Inverter Enclosure
- Troubleshooting
- Decommissioning the Inverter
- Technical Data
- AC1 Connection for Stand-Alone Grid
- AC2 Connection for Utility Grid and Generator (External Energy Source)
- DC Connection for Battery
- Efficiency
- Sunny Island 4.4M Efficiency Profile
- Sunny Island 6.0H Efficiency Profile
- Sunny Island 8.0H Efficiency Profile
- Switchover times of the Sunny Island 6.0H / 8.0H
- Energy Consumption in No-Load Operation and Standby or Energy-Saving Mode
- Noise Emission
- Grid Configuration
- Protective Devices
- Equipment
- Data Storage Capacity
- DC Load Limitation Curve of the Multifunction Relays
- General Data
- AC1 Connection for Stand-Alone Grid
- Spare Parts and Accessories
- Contact
- EU Declaration of Conformity
- UK Declaration of Conformity