Starting the Generator via the User Interface
The basic procedure for changing operating parameters is explained in another section ( > Changing Operating Parameters).
Requirement:
The Sunny Island must be able to control the generator via a control cable.
Procedure:
Request generator unlimited.
Request generator for 1 hour.
Request generator unlimited
- Select Generator > Generator.
- Set the parameter Manual generator control to Start.
- The electricity generator starts and runs until you stop it again.
Request generator for 1 hour
- Select Generator > Operation >.
- Set the parameter Reason for requesting generator to Run1h.
- The generator starts. If there is no generator request after 1 hour, the Sunny Island stops the generator.