Connecting the Measuring Cable of the Multicluster-Box 12
Qualified person
Requirements:
-
The inverters to be connected must be Sunny Island 6.0H / 8.0H inverters.
The utility grid must be connected to the multicluster system (see Multicluster-Box 12 operating manual).
Procedure:
- On every Sunny Island of the main cluster, connect the measuring cable for voltage monitoring of the Multicluster-Box 12 to ExtVtg. First connect the wires of X112 3 and X112 4 at the master to ExtVtg ( > Connecting ExtVtg).
- Connect the conductors of X112 3 and X112 4 on the master to ExtVtg on each Sunny Island of the main cluster.
- Connect the conductors of X112 7 and X112 8 on Slave 1 to ExtVtg on each Sunny Island of the main cluster.
- Connect the conductors of X112 9 and X112 10 on Slave 2 to ExtVtg on each Sunny Island of the main cluster.
- The measuring cable for voltage monitoring from the Multicluster Box 12 is connected.
- At the master of the Main Cluster, connect the AC contactor monitoring. To do this, first connect BatVtgOut- with DigIn- within the master( > Connecting BatVtgOut, DigIn, BatTMP and BatCur).
- Thread both insulated conductors through a ferrite included in the scope of delivery.
- Connect the insulated conductor from X113 3 to BatVtgOut+.
- Connect the insulated conductor from X113 4 to DigIn+.
- The monitoring of the grid contactor is connected.