Recommissioning the Inverter


Qualified person

If you have disconnected the inverter from all voltage sources and want to recommission it, proceed as follows.

Requirements:

Procedure:

    2603689100
  1. For systems with 1 Sunny Island, press the "On" button.
  2. For systems with 3 Sunny Island inverters, press and hold the "On" button on the master until an acoustic signal sounds.
  3. For multicluster systems, press and hold the "On" button on each master until an acoustic signal sounds.
  4. Establish a connection to the user interface of the inverter Establishing a connection to the user interface).