Recommissioning the Inverter
Qualified person
If you have disconnected the inverter from all voltage sources and want to recommission it, proceed as follows.
Requirements:
-
All circuit breakers in the AC distribution board must be open.
-
All Sunny Island inverters must be connected correctly ( > Checking the Wiring).
-
All inverters must be closed ( > Sealing and Closing the Sunny Island).
-
All Sunny Island inverters must be switched off.
-
The fuse switch-disconnector of the battery fuse must be closed ( > Inserting the Fuse Links in the Fuse Switch-Disconnector).
Procedure:
- Switching on the Sunny Island:
-
For systems with one Sunny Island, press the "On" button.
-
For systems with three Sunny Island inverters, press and hold the "On" button on the master until an acoustic signal sounds.
-
For multicluster systems, press and hold the "On" button on each master until an acoustic signal sounds.
- Establish a connection to the user interface of the inverter ( > Establishing a connection to the user interface).