Overview of firmware versions


Systems with parallel operation with the utility grid

The system structure and system configuration (e.g. as battery-backup system) determine the firmware version that is required for commissioning the system.

System structure

SMA Energy System Home with increased self-consumption

SMA Energy System Home with increased self-consumption and battery backup

Battery-backup system

Single system or single-cluster system

from 3.20.09.R

from 3.20.09.R

from 3.20.09.R

Multicluster system with MC-Box-12.3-20

Only with 1.04.00.R

Only with 1.04.00.R

Only with 1.04.00.R

Multicluster system with MC-Box-12.3-20 and GRID-BOX-12.3-20 1)

Only with 1.04.00.R

Only with 1.04.00.R

Only with 1.04.00.R

Off-grid system

The system structure and external energy source (e.g. generator) determine the firmware version that is required for commissioning the off-grid system.

System structure

Generator

Utility grid

Generator and utility grid

Single system or single-cluster system

from 3.20.09.R

from 3.20.09.R

from 3.20.09.R2)

Multicluster system with MC-Box-12.3-20

from 3.20.09.R

from 3.20.09.R

-

Multicluster system with MC-Box-12.3-20 and GRID-BOX-12.3-201)

-

-

from 3.20.09.R

Multicluster system with MC-Box-6.3-11 or MC-Box-36.3-113)

from 3.20.09.R

-

-

1) GRID-BOX-12.3-20 can only be used in countries where compliance with the European requirements for grid connection as set out in Commission Regulation (EU) 2016/631 for establishing a network code (known as RfG) is not required.

2) An external automatic transfer switching device is required.

3) Only suitable for off-grid systems.